Build Progress
Friday, 27 June 2014
Saturday, 14 June 2014
Elevator work
Got a lot of work done today. Back riveted the elevator skins to the rib halves
And the elevator horns on the spar. After originally drill g out #30 that was meant to be for #40 it added an hour as I had to match drillagain and deburr. But got it all done.
And the elevator horns on the spar. After originally drill g out #30 that was meant to be for #40 it added an hour as I had to match drillagain and deburr. But got it all done.
Total time: 5hrs
Thursday, 12 June 2014
Fuselage is here
We drove to Watertown today to pick up the fuselage. The crates were huge and it was a fun slow drive. Thanks for your help Martin. We left Carp around 9:35am and were back by 4:pm. Parking the trailer with the precious cargo at the EAA hangar for this weekend until we get to unloading.
Subscribe to:
Posts (Atom)