Build Progress

Saturday, 28 March 2015

Fuselage Inspection Done.

Huge Milestone for today. Fuselage inspection all done. Pierre and Ritz were wonderful and it was a pleasure working with them.

Sunday, 22 March 2015

Finally Panel Design Begins



Friday, 20 March 2015

More pictures

Sunday, 1 March 2015

Rudder Pedals

Dismantled the rudder pedal assembly last night realized that the F-1039 bracket was not primed. Primed and left it out to dry came back this morning and final mounted the pedals.
Helped Curtis rivet the Baggage area side skin with the flange. Curtis torqued the final bolts on the gear mounts leg.  Also routed the rudder cable through the gr omits in the tail.
Total time : 2 hrs.