Build Progress

Thursday, 30 April 2015

Airplane turned around to make space in the hangar



Monday, 20 April 2015

Conduits pass through

Holes in the side ribs near the spar were too  small to pass a 3/4th OD conduit through.
After speaking with Vans we were ok to enlarge that hole a tiny bit to pass the conduit through.
Completed the enlargement on the aft rib on both sides.
The front rib had an issue the head of the drill and the unit were a little too big to accurately get a straight hole. Stopped work for now to pick up kids.


Total time 1 hour.

Baggage door complete.

Completed the final riveting of the Baggage Door today. All CS4-4 pop Rivets done by hand.
Total time 1 hour.
Thanks Curtis for completing the rest.



Sunday, 19 April 2015

Finally she's on her own legs

Thanks Curtis, Campbell and all the other EAA guys for helping lift the plane on her own legs.
I was away attending a meeting at the airport.

Thursday, 2 April 2015

Access Floors and Cover Planels

Completed the Tunnel Access Covers, Flap Torque Tube Cover and the Wire covers.
Easy Afternoon 2 hours.


Wednesday, 1 April 2015

More cable work and Access Floors

Managed to get more done over 2 hours today.

  • Clamped the brake lines in the tunnel
  • Torqued the bolts on the rudder pedal bushings
  • Torqued the bolts on the Control Column
  • Assembled the Aft Tunnel Cover
  • Assembled the F-1050 Bolt access cover