Build Progress

Saturday, 22 November 2014

Hangar Insulation

Total time 4.5 Hours. 


Sunday, 16 November 2014

Started working on insulating the walls in the hangar for the winter

Curtis brought the material for the walls and I helped him set up the studs on the existing walls.
Tomorrow nail in the boards. We nailed in the boards on the walls Sunday night.

Total time: 2.45 Hours. + 2 hours.

Tuesday, 11 November 2014

Final riveting of tail cone complete.

This is actually a milestone in our project. Curtis and I finally finished the final riveting of the tailcone and the fuselage.

Total time: 3 hours.

Monday, 10 November 2014

Landing Gear

Today campbell and I attempted the first install of the landing gear leg. It was a snug fit and we had to ream the bottom hole a bit.
The leg once in fit in the mount just well. The top part of the leg was about 1 inch away from it's final place but doesn't quite fit right. There is what seems to be a metal ring around the top portion of the mount. I took a picture and sent it over to Peter for some advice.
Hopefully I can get it in this week. Thanks again Campbell for helping and holding the leg in place.

Total time: 1 hour.

Sunday, 9 November 2014

1st row of Riveting Complete

After completing the work for EAA I met up with Curtis at the hangar and we completed the riveting of the first row of aft tivets for the fuselage and tail.
Curtis went and got a new diesel heater.

Total time: 3 Hours

Saturday, 8 November 2014

More photos

Saturday work Finally started riveting the tail and fuselage together. Curtis and I are trying to get a rhythm going. Some of the rivets we had to drill out and redo.

Total time: 4 hours.








Photos

Thursday, 6 November 2014

Landing Gear wheels all assembled.


After picking up the grease from Curtis last night I went downtown for a nice dinner. This afternoon after work I picked up the wheels tubes and tired and drove over to Campbell's place where we got all the wheels assembled, greased and mounted and inflated to about 25psi.
After final mounting on the landing gear legs I will torque them with a wrench and fully inflate to their full size.

Total time: 2.5 hours.




Sunday, 2 November 2014

Sunday Work

Shreyans has come over last night for games night. This morning we drove to Perth to pick up the elevator from Dale. Got back to Carp and met up with EAA folks. Post that we went to the hangar and did some more inventory of the small parts bags that showed up with the Finishing kit.

Got the wheels and the assembly at home for mounting.

Total time: 4+2 hours