We put the cotter pins in the pedal bolts and found out that the washer was incorrectly placed. AFter rechecking all 4 pedals we finally got them right with the cotter pins in place.
Also cut the elevator F1089 and F1090 push rods to size, deburred and marked the ends for drill holes with center punch. Now just drill on the drill press and voila push rods done.
Total time: 4.5 hours. (Campbell helped)
Build Progress
Tuesday, 30 September 2014
Monday, 29 September 2014
Setting up the hangar.
We set up a workbenches and a table to rest the fuselage on. Beautiful and strong the table is strong enough to hold a car. Thanks Curtis for a great design.
Campbell has offered his help with the build which is great. Can always use an extra pair of hands.
We found the material for the spacers for the rudder pedals and have put them in. Only thing remaining is to mount the pedals in the aircraft.
Total time: 6 hours. Plan to put in another 6 hours tomorrow and work on the control columns.
Campbell has offered his help with the build which is great. Can always use an extra pair of hands.
We found the material for the spacers for the rudder pedals and have put them in. Only thing remaining is to mount the pedals in the aircraft.
Total time: 6 hours. Plan to put in another 6 hours tomorrow and work on the control columns.
Saturday, 27 September 2014
Hangar Move!!
Big step for our projecttoday. We have officially moved to the hangar. It huge and the plane looks small. That's because we dont have our wings yet. :)
Total time : 4 hours
Total time : 4 hours
Tuesday, 16 September 2014
Control Column and Flaps
Read through the Control Column assembly and Flaps assy. It's not too complicated. Put the parts together and took it apart for final drilling and deburring. We are waiting to move to the hangar to continue work so things will slow down this week.
Total time 2 hours.
Total time 2 hours.
Monday, 15 September 2014