Build Progress

Tuesday, 30 September 2014

Pedals final - Elevator push Rod ends

We put the cotter pins in the pedal bolts and found out that the washer was incorrectly placed. AFter rechecking all 4 pedals we finally got them right with the cotter pins in place.

Also cut the elevator F1089 and F1090 push rods to size, deburred and marked the ends for drill holes with center punch. Now just drill on the drill press and voila push rods done.

Total time: 4.5 hours. (Campbell helped)

Monday, 29 September 2014

Setting up the hangar.

We set up a workbenches and a table to rest the fuselage on. Beautiful and strong the table is strong enough to hold a car. Thanks Curtis for a great design.

Campbell has offered his help with the build which is great. Can always use an extra pair of hands.
We found the material for the spacers for the rudder pedals and have put them in. Only thing remaining is to mount the pedals in the aircraft.

Total time: 6 hours. Plan to put in another 6 hours tomorrow and work on the control columns.



Saturday, 27 September 2014

Hangar Move!!

Big step for our projecttoday. We have officially moved to the hangar. It huge and the plane looks small. That's because we dont have our wings yet. :)

Total time : 4 hours


Tuesday, 16 September 2014

Control Column and Flaps

Read through the Control Column assembly and Flaps assy. It's not too complicated. Put the parts together and took it apart for final drilling and deburring. We are waiting to move to the hangar to continue work so things will slow down this week.

Total time 2 hours.

Monday, 15 September 2014

Pedals bolted to frame.

Pedals were Riveted and bolted onto the Frame. 

Total time about 4 hours.

Pedals bolted with Master Cylinder

Count find the spacers for the master cylinders. Will Put those in later. 

Total time about 2 hours.